概要

OSP Works Supervision in excavation, cable and duct laying, cable blowing
o Supervision of Optical Fiber splicing and Testing Activity (2 and 16 core)
o Supervision of T-joint Activity (16-Core)
o Joint survey of site with client subcontractors for base line drawing and implementation
o Site survey for Red Line Drawing and As Built Drawing
o Site Inspection with JP Subcontractor for PAT (Preliminary Acceptance Test)
o Installing manholes, hand holes, marker post installation, restoration and related civil works
o Making Daily Plan and Progress Report on daily basis and update to all levels
o To prepare sites for final acceptance and complete site documentation
o Procurement of Engineering and Civil Material, Store Management
o To coordinate between design departments, analyzing soil structural reports for work packages for Contractors and to execute necessary changes as per site requirements
Power manager in Electrical
Start working as Team leader Optical Fiber Cable operation maintenance

项目

Punjab Safe City project Lahore (PPIC3)

工作经历

公司标识
OSP Engineer
Technology at work (Huawei)
Jul 2016 - 代表 | Lahore, Pakistan

Quality control of out site plant cable network.
preparation of OSP related documents.
Making route surveys with much economy and feasibility.
Material planning,monthly requiements,Dispatch instructions.
Dealing with contractors,sub contractors and other operators.
Working plan for the given drawings.

学历

Government College University Faisalabad
学士, Bachelors in Engineering, Electrical Engineering‎
Telecommunications
CGPA 2.7/4
2016

技能

初学者 Nutrition Management:
中级 out site plantation

语言

中级 英语